1,687Power Projects34.9% of all projects
905Transmission53.6% of the sector
922In Execution54.7% of the sector
EasternLeading Region23.7% of power projects

Where the power pipeline sits

Transmission905
Production419
Generation102
Treatment & utilities99
Upstream / downstream130

Power projects by phase

Execution922
Planning & design316
Tendering295
Recently awarded154

Top regions for power projects

Eastern Province400
Riyadh Province343
Mecca Province271
Al-Madinah Province144
Asir Province96

Month-on-month movement

Power projects — July1,711
Power projects — August1,687
All sectors — July4,809
All sectors — August4,835

Key insights

Transmission carries the sector. 905 transmission projects account for 53.6% of all power activity — grid expansion and reinforcement, rather than new generation, is where the volume sits.

More than half is already on site. 922 power projects are in execution, with a further 295 at tender stage and 154 awarded in recent months.

The east leads, the centre follows. Eastern Province holds 400 power projects (23.7%), ahead of Riyadh at 343 and Mecca at 271.

A steady month overall. The wider market edged up 0.5% to 4,835 projects, while power eased 1.4% — a normal cycle of completions rather than a slowdown in commitment.

ADRT perspective

Power remains the single largest slice of the Saudi project pipeline at 34.9%. Its weighting towards transmission points to a long, repeatable stream of work for cable, switchgear, tower and substation suppliers, and for contractors able to qualify on grid packages. Regional concentration in the Eastern Province means a focused qualification effort can reach a disproportionate share of the sector.

Identify the power projects that match your scope and qualification profile.

Schedule a Consultation
Project counts reflect active developments tracked during August 2026 and are reported as counts, not aggregate values, to avoid double-counting across multi-phase developments.
This report may be quoted or referenced with clear attribution to ADRT Commercial Development Company. Reproduction in full or in substantial part without prior written permission is prohibited.
ADRT™ Commercial Development Company | Jeddah, Saudi Arabia | +966 55 562 2456 | info@adrtsa.com | www.adrtsa.com